Portfolio

Concrete Batching Plan

Land Uses:
Industrial
Location:

Town of Whitby, ON

Adddress:

Northeast Corner of South Blair Street and Gerdau Court, Town of Whitby

Architectural site plan illustrating the design and layout of the new building and its surroundings.

The proposed development comprises of 957.10 m² Concrete Batching Plant within a prefabricated steel structure on a slab-on-grade concrete foundation. The facility will manufacture concrete products for construction and infrastructure projects. Access to the site is proposed via two full-movement driveways from South Blair Street and Gerdau Avenue, with the South Blair Street access aligned to the private driveway of SkyZone. The development will provide 10 parking spaces, including one accessible space, along with six loading bays.

Related Portfolio

Architectural site plan illustrating the design and layout of the new building and its surroundings.

Industrial

Concrete Batching Plan

New Walmart store site plan, illustrating building layout and nearby features.

Industrial

Industrial Building

Map showing the proposed location for the new airport, highlighting key areas and access routes.

Industrial

Waste Transfer and Recycling Centre (York1)

Overview of the new building's site plan, including key features and spatial organization.

Industrial

General Industrial Building – Food Manufacturing, Warehousing, and Distribution

Concept art of the new building at the new site, highlighting its innovative structure and nearby features.

Industrial

Industrial Warehouse Building

Resume: